The Integrated Transport Strategy was published in 2018, under the leadership of mayor Bernadene Voss.  In 2026, the Council is consulting about a new ITS.   

You can give your feedback on the strategy (by 6th December 2026). You can also join a working group.

The council congratulates itself that all of the 2018 actions are “on track or complete”. 

From the CEO’s report, Nov 2026

In the Nov 2026 report to council, the CEO reported that all the active and public transport actions were “on track or complete”.      We don’t have the item by item breakdown, so we’ve made our own assessment of the cycling actions.  

Message to council:  if your plan is for a safe protected bike lane, and you downgrade that to paint on road… you don’t get to count that as “on track” or “complete”.

Below we review how many of the cycling actions were completed, and to what extent.    We find that very few of the actions were completed;  but also that the number of cycling trips has increased despite this lack of investment. 

What was in the Integrated Transport Strategy

The 2018 ITS was supported by data and solid research about urban mobility.   Its target for 2028 was that cycling to/from and internally in Port Phillip  should increase by 151%, from 17,000 to 44,000 trips per year. 

The action with the most potential impact is safe bike infrastructure, where people are either separated from heavier vehicles, or else are in a low speed, low traffic environment.    The experience in many many cities is that this will not only improve overall numbers, but also give access to currently under-served groups (children cycling independently or with their families, women, older people).   This approach was captured in Outcome 2, item 18.

For this ITS, there were extensive community consultations, in which the Council found “strong support to improve bike lane infrastructure for safe bike riding experiences.”

Has the council done what it proposed?

>

Cycling related items proposed in Outcome 2

What has been delivered (by Nov 2026)

Summary

13. Complete the intersection upgrade of Wellington Street to improve traffic safety, and pedestrian and bike riding facilities


Wellington St has sharrows (painted markings on the road intended to encourage shared used).   These have a poor evidence base for supporting increased cycling, and increased safety.  The narrow carriageway results in limited opportunities for safe overtaking;    there are reports of aggressive driving.     Traffic volumes mean that while some user groups will feel comfortable, others will not.    

Minor upgrades

14. Develop criteria to assess change of road space from vehicle use to create space for social connection, trade, and walking and bike riding links.


???


16. Work with school communities to support active travel to school as a popular, safe and easy travel option


???


17. Trial initiatives to increase priority and space for walking, bike riding and play

Council decision making across the board has shown little priority for cycling or walking, with clear priority given to retention of parking or vehicle traffic (eg. Park St link, Inkerman St, Kerferd Rd).  

Not done.

18. Deliver a network of dedicated and continuous protected bike corridors to create safer routes for all ages and abilities, detailed below.


Very little done, route-by-route comments below


ITS Route 1 Moray St to City

MMRA built a protected bike lane on the north end of Moray St.   The south half is a painted lane with buffer.  

Half done.

ITS Route 2 Albert Rd to Kerferd Rd

Shrine to sea link, vetoed by Council (see 19 below)

Not done

ITS Route 3 Park St link

St Kilda Rd to Kingsway:   A separated albeit poor-quality protected bike lane was delivered in 2025.    Council downgraded a proposed on-road, separated lane to include sections on the footpath, thus degrading both pedestrian and cyclist amenity. 

Kingsway to Heather St:   temporary protected bike lane, very good amenity.

Heather St to Moray St:  unprotected painted on-road lane, no improvement. 

Mostly completed but with substandard design.

ITS Route 4 Garden city off road connection

Completed 2021.

Complete.

ITS Route 5 Dorcas St / Nelson Rd / Foote St - Kings Way to Beach

????


ITS Route 6 Inkerman St - Grey Street/ Canterbury Rd to Glen Eira connection

In 2024, the Inkerman St Safety corridor project had 2 options:  A, a protected bike lane. B, painted bike lane with a buffer, some intersection improvements.  Council chose B based on concerns about parking loss impacting local business (no evidence supporting this was tendered).    Not delivered as of Nov 2026.

No improvements planned for Inkerman between St Kilda Rd and Barkly St; or for Grey St.

Planned with very substandard design. 

ITS Route 7 Sandringham Line/ Westbury St - Ripponlea to Windsor

Small improvements on Westbury St, but this is still not a bicycle friendly street, due to shared use and traffic volumes.  

Some improvements for Glen Eira Ave proposed in the 2026 draft Ripponlea streetscape plan. 

No improvements planned between Glen Eira Rd and Hotham St. 

Very minor changes

ITS Route 8 Dickens St - Balaclava to St Kilda Beach

Minor improvements installed as part of the pop-up trial (eg curb built-outs at intersection of Dickens and Marine Parade, sharrow markings on Dickens) removed at insistence of council.    


No

Street closure outside St Kilda PS.   


Very good

ITS Route 9  Acland St / Mitford St / Beach St - Fitzroy St to Elwood Beach

Poor connection to Fitzroy St. 

Partial street closures on Acland St mean this is fairly friendly between Jackson St and Carlisle St.    Mitford St is unpleasant to ride with no scope for safe overtaking.  No improvements on Beach St, poor connection to Elwood Beach. 


ITS Route 10 Tennyson St/ Blessington St - Elwood to St Kilda Beach

The closure of Blessington St (intersection with Barkly) without the mooted bicycle counterflow lane means that this is worse for westward travelling cyclists.   New bike lanes on Blessington St through the peanut farm.  


ITS Route 11: Byron St/ Glen Eira Rd - Ripponlea to Elwood. 

Introduction of 30km/hr speed limits through Ripponlea village will offer minor improvements.   Otherwise no protection, not even a painted bike lane in some areas. 


ITS Route 12: Bridge St/ Richardson St/ Loch St - Port Melbourne to St Kilda

Very minor— some paint on the road (painted lanes, some green paint at intersections, some sharrows). 

Very minor changes

ITS Route 13: Alexandra St - Prahran to Balaclava (proposed for completion post 2027/28)

No improvements

Not done


ITS Route 14: Armstrong St - Middle Park Beach to Albert Park trail (proposed for completion post 2027/28)

No improvements

Not done


19. Partner with Parks Victoria to plan and deliver the Shrine to Sea boulevard to deliver safety and streetscape improvements for walking and bike riding

(subject to State funding)

No.  Delivery of the Kerferd Rd bike lane was vetoed by Council, despite having State funding.

Not done


20. Partner with VicRoads to deliver a better walking, bike riding and public transport environment along St Kilda Road


VicRoads completed a separated bike lane along St Kilda Rd in 2024.  The section between St Kilda junction and Carlisle St was not built.  

Council has consistently supported St Kilda Rd infrastructure upgrades but this is a State issue. 

Mostly done, but incomplete



21. Partner with Victorian Government to design and deliver high quality bike parking facilities at train and tram hubs to integrate bike riding with public

transport

Balaclava station has a bicycle parking facility but it isn’t open. Anzac station: unsecured parking only. 

Ripponlea has no secure bike parking.  

See image below.

Not done

22. Encourage and support the community to ride bikes

No.   Extensive research shows the most effective support for cycling is providing safe places for people to cycle. The network has not been built. Increase in cycling numbers have come despite lack of support from Council. 

Not done.


Locations of the parkiteer cages at stations

Locations of parkiteer secure bike facilities at stations.

Are we meeting the goals in the strategy?

We have good transport data available via the VISTA survey.  We can see that Port Phillip is meeting its cycling mode share target, and exceeding its PT target. However it’s well short of its walking target, and private car use is well above where it should be.   Since the overall number of trips in the LGA have increased, this means a lot more cars on the streets. 

There is an interesting story in the yearly VISTA data, where number of cycling trips has shot up just in the last couple of years.    

Some Factors contributing to the failure to implement actions

  • A hostile council undermined implementation of this strategy at every stage.   Councillors actively shared misinformation and rallied residents against implementation.  When opportunities for implementing the strategy came up (for example, Inkerman St) Council prioritised the minority living near the street rather than all users of the street. 

  • VicRoads delivered a “pop-up infrastructure trial” with no consultation. It did not deliver any of the proposed separated bike lanes in the strategy, but rather minor intersection improvements, curb build-outs, painted bike lanes and the like.  There was a lot of hostility against this, and it was almost all removed.   There remains an active minority of residents who rail against any improvements for cycling. 

  • Items relying on State government to deliver were to some extent beyond Council’s control, however Council could effectively veto projects planned by State, and it did so (Kerferd Rd and the pop-up trial). 

(Some data is missing above—- if you know whether anything has been done on these routes let me know in the comments and I’ll update).